Regional programmes

The programmes our mandate reads against.

Public energy and radiation-safety programmes in the regions we cover. We back the suppliers and technology inside them — the layer beneath the programme, where qualification decides who wins.

PROG/CA-01

Power generation, grid & efficiency

Region
Central America
Programme owner
Regional transmission operator and energy ministries, identity withheld
Status
Active — second-circuit works authorised; procurement under regional regulator oversight

Transmission reinforcement on the Central American Electrical Interconnection System (SIEPAC): second 230 kV circuits on the Agua Caliente–Sandino (Honduras–Nicaragua) and La Virgen–Fortuna (Nicaragua–Costa Rica) spans, using the free arm of existing towers — conductors, insulators, fittings, and substation interface hardware. Scope sits at the lead-time choke for firm generation interconnection across the Mercado Eléctrico Regional, not at retail supply or trading platforms.

Public recordCRIE resolutions CRIE-22-2024 (line definition change) and CRIE-07-2025 (initial budget ~USD 46.5M and financing with BCIE loan, EPR equity, and servitude fund). Public summaries via CRIE and BNamericas.

Ring in the atlas

PROG/CA-02

Fuel cycle, safety & monitoring

Region
Central America
Programme owner
National radiation-safety authorities, identity withheld
Status
Active — IAEA technical cooperation cycle underway (approved 2024)

Civil radiation-safety and monitoring capacity for Central American competent authorities: regulatory infrastructure, source registers, personal and area dosimetry, radioactive-waste and transport safety, and emergency preparedness — the non-power side of the fuel-cycle ring. Engineering read is calibration traceability, inspection capability, and whether national labs can sustain monitoring without depending on a dashboard over someone else's sensors.

Public recordIAEA technical cooperation project RLA9095 (Strengthening the Regulatory Infrastructure to Enhance Radiation Safety in Latin America and the Caribbean), approved 1 Jan 2024, active; participating states include Costa Rica, Panama, El Salvador, Honduras, Guatemala, and Nicaragua. Project record: iaea.org/projects/tc/rla9095.

Ring in the atlas

PROG/AF-01

Reactor systems & civil nuclear

Region
Africa
Programme owner
National utility and nuclear regulator, identity withheld
Status
Active — Unit 1 licensed for long-term operation to 2044; Unit 2 decision pending

Long-term operation of the Koeberg twin-unit PWR station beyond the original forty-year licence: ageing management of systems, structures and components, containment monitoring, and post-licence safety-improvement commitments under the national regulator. Scope sits at plant-life extension — inspection, monitoring, and qualification of SSCs for another operating interval — not at new-build FOAK economics.

Public recordNational Nuclear Regulator licence NIL-01 Variation 21 for Koeberg Unit 1 LTO to 21 July 2044 (directive k10001925N, July 2024). IAEA SALTO follow-up mission, 3–6 September 2024. Eskom Public Information Document for LTO and Public Safety Information Forum briefing, March–May 2025.

Ring in the atlas

PROG/AS-01

Reactor systems & civil nuclear

Region
Asia
Programme owner
Energy ministry and state nuclear project owners, identity withheld
Status
Active — programme restarted 2024; Phase 2 infrastructure review completed December 2025

Restart of the Ninh Thuan civil nuclear power project: two coastal plant sites (Ninh Thuan 1 and 2), site and infrastructure preparation, licensing pathway, and owner capability under a revised Atomic Energy Law. Scope sits at the FOAK bottleneck for a newcomer programme — competent-authority readiness, human resources, waste arrangements, and whether the licensing path is named before hardware contracts dominate the schedule.

Public recordNational Assembly Resolution 174/2024/QH15 (30 November 2024) restarting Ninh Thuan; February 2025 National Assembly resolution on special mechanisms and policies for the project. IAEA Phase 2 Integrated Nuclear Infrastructure Review mission, 1–11 December 2025. IAEA press release on the mission.

Ring in the atlas

PROG/GU-01

Power generation, grid & efficiency

Region
Gulf region
Programme owner
Regional interconnection authority and energy ministry, identity withheld
Status
Active — Al-Wafra station in initial operation; full national-grid integration targeted early 2026

Gulf Cooperation Council electricity interconnection expansion centred on the Al-Wafra 400 kV station in southern Kuwait: double-circuit overhead lines toward Al-Fadhili, domestic ties into Sabah Al-Ahmad substations, switchgear, reactors, and protection/control hardware. Scope sits at the transmission lead-time choke for cross-border firm capacity — interconnection capacity and grid-code hardware, not retail supply or trading platforms.

Public recordGCCIA Al-Wafra 400 kV interconnection project (construction from 2022; initial operation reported 2024–2025). Kuwait Fund financing agreements with GCCIA for Gulf interconnection expansion. Public coverage via Zawya, Kuwait Times, and Kuwait Fund statements on capacity uplift and line routes (Al-Wafra–Al-Fadhili; Al-Wafra–Al-Faw).

Ring in the atlas

PROG/EU-01

Energy storage & batteries

Region
Europe
Programme owner
National power company, identity withheld
Status
Active — engineering design phase; supplier market consultation ahead of investment decision

A 30 MW battery energy storage system co-located at the 690 MW Fljótsdalur hydropower plant in eastern Iceland, grid-tied to the national transmission system. Scope is pack, power-conversion, and plant-interface hardware sized for utility service — cycle life, containment, and grid-code compliance at a named hydro site — not coin-cell chemistry claims or behind-the-meter EV charging pilots.

Public recordLandsvirkjun preliminary market consultation for a 30 MW BESS in Iceland (co-located at Fljótsdalur; engineering design phase toward an investment decision). Notice carried on Landsvirkjun’s tender channel and procurement aggregators (e.g. Mercell / IcelandTenders).

Ring in the atlas

PROVENANCESources above document the programmes and their public financing decisions. They are listed as the demand context our mandate reads against — not as a claim that Isotope is a contracting party to any of them. Programme owners are named in their own public records.